Development update – Phase 2, Accelerator Park
Construction is progressing apace on the second phase of development at Accelerator Park.
Phase 2 will provide three new high-tech R&D / Life Science buildings, providing space ranging from 20,000 to 86,300 sq ft, available from Q2 2025.
The new units offer:
· level access loading doors
· 10m eaves height
· Cat A Lab-enabled office specification and M&E plant.
· Multiple EV charging
· 50KN/M2 floor loading
· 136 car parking spaces (total across 3 units)
· 80 cycle spaces (total across 3 units)
With ESG high on the agenda, the new development is targeting sustainability credentials including BREEAM ‘Excellent’ and an EPC A rating, with EV charging, PV panels, enhanced site-wide biodiversity, zero waste to landfill and a rich, landscaped environment for occupiers to enjoy. Community benefits also include an onsite café and a private gym.
Accelerator Park is strategically located and provides excellent access to the wider motorway and A-road network being situated adjacent to the A505, providing immediate access to the M11, A11, A1(M) and A14.
DTRE and Bidwells are joint letting agents for Accelerator Park Phase 2.